How to calculate the consumption cost of the energy :
First of all the transmission cost of the electrical energy has to be calculated :
- the cost of the transmission of electrical energy, called - CE:
CE = Ssvn * P + ( Σ Szopk * Ek )
- Ssvn - permanent component of the net rate - quoted in PLN/kW/month - see table IV
- P - contracted power
- Szopk - it is a sum of the following components : Szopk1 and Szopk2 - see table IV
- Ek - the quantity of the energy transmission - quoted in the energy units.
- m - the number of the time zones
- a total cost of the energy consumption = Pe * Ec * CE
- Pe - price of the electric energy quoted in PLN / MWh up to zone time
- Ec - the quantity of the energy consumption. This components is monitored by the electricity meter
- CE - as presented above
Table I
Tarriff group |
designated for recipients |
this tariff presents an average voltage only |
B23 |
contracted power above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in the three time zones and in the two season zones. |
B22 |
contracted power above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in the two time zones. |
B21 |
contracted power above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in one time zone. |
B11 |
contracted power not above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in one time zone. |
The time zones used in the calculations :
Tarriff group B23 :
Table II
Tarriff number and zone's names |
season |
summer
(since 1th to 30 th September) |
winter
(since 1th October to 31th March) |
|
- Zone I
- Zone II
- another hours
|
7 am – 1 p.m
7 p.m – 10 pm
1 p.m – 7 p.m and 10p.m – 7 a.m |
7 a.m-1 p.m
4 pm-9 p.m
1 p.m-4 p.m and 9 p.m – 7 a.m |
Tarriff group B22 :
Month |
Zone III |
Zone IV |
January
February
March |
8a.m-11a.m and 4p.m-9p.m
8a.m-11a.m and 4p.m-9p.m
8a.m-11a.m and 6p.m-9p.m |
11a.m-4p.m and 9p.m-8a.m
11a.m-4p.m and 9p.m-8a.m
11a.m-6p.m and 9p.m-8a.m |
April
May
June
July
August
September |
8a.m-11a.m and 7p.m-9p.m
8a.m-11a.m and 7p.m-9p.m
8a.m-11a.m and 8p.m-9p.m
8a.m-11a.m and 8p.m-9p.m
8a.m-11a.m and 8p.m-9p.m
8a.m-11a.m and 7p.m-9p.m |
11a.m-7p.m and 9p.m-8a.m
11a.m-8p.m and 9p.m-8a.m
11a.m-8p.m and 9p.m-8a.m
11a.m-8p.m and 9p.m-8a.m
11a.m-8p.m and 9p.m-8a.m
11a.m-7p.m and 9p.m-8a.m |
October
November
December |
8a.m-11a.m and 6p.m-9p.m
8a.m-11a.m and 4p.m-9p.m
8a.m-11a.m and 4p.m-9p.m |
11a.m-8p.m and 9p.m-8a.m
11a.m-4p.m and 9p.m-8a.m
11a.m-4p.m and 9p.m-8a.m |
Table of the prices and rates for following tariff : B11 ; B 21 ; B22 ; B23 :
Table IV
prices and rates |
tariff group |
|
B23 summer |
B23 winter |
B22 |
B21 |
B11 |
turnover
|
|
|
|
|
|
price of the electric energy quoted in PLN / MWh - Pe
|
- full - day |
x |
x |
x |
160.63 |
178.51 |
- zone III |
x |
x |
179.25 |
x |
x |
- zone IV |
x |
x |
144.59 |
x |
x |
- zone I |
170.01 |
170.60 |
x |
x |
x |
- zone II |
226.76 |
225.64 |
x |
x |
x |
- another hours |
132.92 |
132.48 |
x |
x |
x |
subscription payment – PLN per month* |
105.36 |
distribution and transmission of electric energy |
System rate – PLN/MWh – Szopk I |
49.37 |
Variable component of the net rate – quoted in PLN/MWh - Szopk2 |
- full-day |
x |
x |
x |
38.84 |
15.99 |
- zone III |
x |
x |
57.17 |
x |
x |
- zone IV |
x |
x |
30.98 |
x |
x |
- zone I |
14.60 |
24.24 |
x |
x |
x |
- zone II |
17.25 |
38.84 |
x |
x |
x |
- another hours |
11.48 |
12.02 |
x |
x |
x |
permanent component of the net rate – quoted in PLN/kW/month – called Ssvn |
6.67 |
7.56 |
7.45 |
3.60 |
subscription payment – PLN per month** |
105.36 |
* only for buyers of the electric energy and transmission of electrical energy
** only for buyers of the transmission of electrical energy
The entrepreneurs placed in tariff B, have to cover 25% of the total connection cost to a power source ( according to invoice issued by the Electric Company). This cost doesn't include electric line and transformer , located on the company territory.
The costs of the electric equipment for Tarriff B in 2004 , used for connection to a power source ( necessary and additional expenses ) are as follow :
- a container station ( transformer ) - 80 000 PLN ( 17 100 Euro )
- a pole station ( transformer ) - 30 000 PLN ( 6 410 Euro )
- 1 kilometer of a cable line in the ground ( the average voltage ) - 120 000 PLN (25 650 Euro )
- 1 kilometer of an air line ( the average voltage ) - 90 000 PLN ( 19 230 Euro )
The Commune and town Odolanów has estimated a cost of the energy connection for its investment sites . The cost are presented separately for every investment site.
Let's start from the investment site located near Raczyce village (near KRIO -the denitrification plant ). The building cost of 500m air line, average voltage , including transformer station 100kV is 42 712, 00 PLN. The costs of such investment on site located in Gliśnica village ( near WOSEBA Company ) : 500 m of an air line including 100kV transformer station and on site located near Gliśnica village : 700m of a ground line including 100kV transformer station are 42 712,00 PLN and 72 495,00 PLN respectively.