the electric energy sector ::  

city of ostrów wielkopolski»   
map    
offer #1    
offer #2    
offer #3    
offer #4    
offer #5    
offer #6    
offer #7    
offer #8    
offer #9    
ostrów wielkopolski community»   
map    
offer #1    
offer #2    
nowe skamielrzyce community»   
map    
offer #1    
offer #2    
odolanów community»   
map    
offer #1    
offer #2    
przygodzice community»   
map    
offer #1    
offer #2    
raszków community»   
map    
offer #1    
offer #2    
offer #3    
offer #4    
offer #5    
offer #6    
offer #7    
offer #8    
sieroszewice community»   
map    
offer #1    
offer #2    
sośnie community»   
map    
offer #1    
This information is provided by the Electrical Transmission Company , located in Kalisz - branch office in Ostrów Wielkopolski.

address :
Rejonowy Zakład Energetyczny Ostrów Wielkopolski
63-400 Ostrów Wielkopolski , ul. Zamenhoffa 2
phone : +62 / 737 82 00 , fax.: +62 / 737 82 28
rzeostrow@energetyka.kalisz.pl

How to calculate the consumption cost of the energy :

First of all the transmission cost of the electrical energy has to be calculated :
  1. the cost of the transmission of electrical energy, called - CE:

    CE = Ssvn * P + ( Σ Szopk * Ek )

    • Ssvn - permanent component of the net rate - quoted in PLN/kW/month - see table IV
    • P - contracted power
    • Szopk - it is a sum of the following components : Szopk1 and Szopk2 - see table IV
    • Ek - the quantity of the energy transmission - quoted in the energy units.
    • m - the number of the time zones

  2. a total cost of the energy consumption = Pe * Ec * CE

    • Pe - price of the electric energy quoted in PLN / MWh up to zone time
    • Ec - the quantity of the energy consumption. This components is monitored by the electricity meter
    • CE - as presented above
Table I

Tarriff group

designated for recipients

this tariff presents an average voltage only

B23

contracted power above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in the three time zones and in the two season zones.

B22

contracted power above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in the two time zones.

B21

contracted power above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in one time zone.

B11

contracted power not above 40 kW or annual energy consumption more than 80 MWh. The calculation for energy supply is made in one time zone.

The time zones used in the calculations :
Tarriff group B23 :

Table II

Tarriff number and zone's names

season

summer
(since 1th to 30 th September)
winter
(since 1th October to 31th March)
 
  1. Zone I


  2. Zone II


  3. another hours


 

7 am – 1 p.m

7 p.m – 10 pm

1 p.m – 7 p.m and 10p.m – 7 a.m

7 a.m-1 p.m

4 pm-9 p.m

1 p.m-4 p.m and 9 p.m – 7 a.m

Tarriff group B22 :

Month

Zone III

Zone IV

January

February

March

8a.m-11a.m and 4p.m-9p.m

8a.m-11a.m and 4p.m-9p.m

8a.m-11a.m and 6p.m-9p.m

11a.m-4p.m and 9p.m-8a.m

11a.m-4p.m and 9p.m-8a.m

11a.m-6p.m and 9p.m-8a.m

April

May

June

July

August

September

8a.m-11a.m and 7p.m-9p.m

8a.m-11a.m and 7p.m-9p.m

8a.m-11a.m and 8p.m-9p.m

8a.m-11a.m and 8p.m-9p.m

8a.m-11a.m and 8p.m-9p.m

8a.m-11a.m and 7p.m-9p.m

11a.m-7p.m and 9p.m-8a.m

11a.m-8p.m and 9p.m-8a.m

11a.m-8p.m and 9p.m-8a.m

11a.m-8p.m and 9p.m-8a.m

11a.m-8p.m and 9p.m-8a.m

11a.m-7p.m and 9p.m-8a.m

October

November

December

8a.m-11a.m and 6p.m-9p.m

8a.m-11a.m and 4p.m-9p.m

8a.m-11a.m and 4p.m-9p.m

11a.m-8p.m and 9p.m-8a.m

11a.m-4p.m and 9p.m-8a.m

11a.m-4p.m and 9p.m-8a.m

Table of the prices and rates for following tariff : B11 ; B 21 ; B22 ; B23 :

Table IV

prices and rates

tariff group

 

B23 summer

B23 winter

B22

B21

B11

turnover

 

 

 

 

 

 

price of the electric energy quoted in PLN / MWh - Pe

 

- full - day

x

x

x

160.63

178.51

- zone III

x

x

179.25

x

x

- zone IV

x

x

144.59

x

x

- zone I

170.01

170.60

x

x

x

- zone II

226.76

225.64

x

x

x

- another hours

132.92

132.48

x

x

x

subscription payment – PLN per month*

105.36

distribution and transmission of electric energy

System rate – PLN/MWh – Szopk I

49.37

Variable component of the net rate – quoted in PLN/MWh - Szopk2

- full-day

x

x

x

38.84

15.99

- zone III

x

x

57.17

x

x

- zone IV

x

x

30.98

x

x

- zone I

14.60

24.24

x

x

x

- zone II

17.25

38.84

x

x

x

- another hours

11.48

12.02

x

x

x

permanent component of the net rate – quoted in PLN/kW/month – called Ssvn

6.67

7.56

7.45

3.60

subscription payment – PLN per month**

105.36


* only for buyers of the electric energy and transmission of electrical energy
** only for buyers of the transmission of electrical energy

The entrepreneurs placed in tariff B, have to cover 25% of the total connection cost to a power source ( according to invoice issued by the Electric Company). This cost doesn't include electric line and transformer , located on the company territory. The costs of the electric equipment for Tarriff B in 2004 , used for connection to a power source ( necessary and additional expenses ) are as follow :

  • a container station ( transformer ) - 80 000 PLN ( 17 100 Euro )
  • a pole station ( transformer ) - 30 000 PLN ( 6 410 Euro )
  • 1 kilometer of a cable line in the ground ( the average voltage ) - 120 000 PLN (25 650 Euro )
  • 1 kilometer of an air line ( the average voltage ) - 90 000 PLN ( 19 230 Euro )

The Commune and town Odolanów has estimated a cost of the energy connection for its investment sites . The cost are presented separately for every investment site. Let's start from the investment site located near Raczyce village (near KRIO -the denitrification plant ). The building cost of 500m air line, average voltage , including transformer station 100kV is 42 712, 00 PLN. The costs of such investment on site located in Gliśnica village ( near WOSEBA Company ) : 500 m of an air line including 100kV transformer station and on site located near Gliśnica village : 700m of a ground line including 100kV transformer station are 42 712,00 PLN and 72 495,00 PLN respectively.