the gas and gas connection ::  

city of ostrów wielkopolski»   
map    
offer #1    
offer #2    
offer #3    
offer #4    
offer #5    
offer #6    
offer #7    
offer #8    
offer #9    
ostrów wielkopolski community»   
map    
offer #1    
offer #2    
nowe skamielrzyce community»   
map    
offer #1    
offer #2    
odolanów community»   
map    
offer #1    
offer #2    
przygodzice community»   
map    
offer #1    
offer #2    
raszków community»   
map    
offer #1    
offer #2    
offer #3    
offer #4    
offer #5    
offer #6    
offer #7    
offer #8    
sieroszewice community»   
map    
offer #1    
offer #2    
sośnie community»   
map    
offer #1    

The information is provided by the Wielkopolska Spółka Gazownicza located in Poznań, branch office in Ostrów Wielkopolski. The Gas Company is open for any individual negotiation with the potential foreign investor. The negotiations depend on a quantity of the gas used (quoted in m3 per 1 hour ) by the gas receiver - client. Moreover the gas company is able to co-finance and finance a building investment of the gas net (pipeline), depending on the quantity of the used gas by the client.

We assume that company uses gas in production process and social activity , therefore it is qualify to the tariff group W6. It means that the contracted power ( b ) is located in a following range : 65 < b < 600. B is quoted in m3 per 1 hour units.

The company could co-finance the gas-net building investment and gas connection provided that b > 200 m3/hour and the client will declare the quantity of the gas , used per 1day. Gas is provided by a pipeline to the receiver/client. The diameter of pipelines is: 50, 63, 75 and 90 mm and depends on the quantity of the used gas.
Attachment nb 1 shows a maximum capacity of the pipeline.

Prices and payments for receivers who are connected to the gas net
The payment for the used gas is calculated as follow : the gas quantity (measured by the gas meter) multiplied by its price.
Additionally the client covers the cost of the gas transmission according to following pattern:

Qg = Szg*Q + Ssg*Mp*T

Qg - a payment for a transfer service
Szg - a rate of a variable payment for a gas transfer is different and depends from seasons (winter and summer).
Q - a quantity of gas adequately for winter and for summer season
Ssg - a rate of a constant group payment [quoted in PLN/(m3/h)] for each 1 hour of the calculation period
Mp - a contracted power ( quoted in m3/h )
T - a number of hours in the calculation period

The receiver is obliged to pay a monthly constant fee and the gas company provides gas to each receiver, who is connected to the gas net - according to the agreement.

The attachment nr 2 presents prices and payments for receivers, who are connected to the gas net.

Payments for a standard connection to the gas net/gas pipeline (attachment nr 1)
 

Diameter of the pipeline

Maximum capacity

Medium pressure of the pipeline

Nm3/h

1.

40 mm

157

2.

50 mm

246

3.

63 mm

390

4.

75 mm

553

5.

90 mm

797

6.

110 mm

1191

7.

125 mm

1538

8.

140 mm

1929

9.

160 mm

2519

10.

180 mm

3188

11.

200 mm

3936

12.

225 mm

4982

13.

250 mm

6151

14.

280 mm

7715

15.

315 mm

9765

Prices and payments for clients, who are connected to the gas net/gas pipeline (attachment 2)
Tariff group Prices and rates
the gas prices Constant Fee Payment for transfer service
Constant Variable
01.10-31.03. (winter) 01.04.-30.09. (summer)
zł/m3 zł/month zł/month zł/(m3/h) for h zł/m3 zł/m3
W-5 0,4756 60 X 0,0337 0,2506 0,2316
W-6 0,4756 100 X 0,0430 0,2238 0,2070
W-7 0,4756 200 X 0,433 0,1712 0,1583
Prices and payments don't contain value added tax (VAT) - 22%.


Payments for the standard connection to the gas net / gas pipeline

Diameter of

connection

The building cost of a pipeline section (lump sum) till 5 m in standard conditions

The building cost of a pipeline section more than 5 m in standard conditions

mm

zl

zl/m

 

in open excavation- grounds without hardened surface

in open excavation, - grounds with hardened surface

a push in a grounds, without disturbance of the surface

in open excavation- grounds without hardened surface

in open excavation, - grounds with hardened surface

a push in a grounds, without disturbance of the surface

25

920

1229

1500

28

67

160

32

950

1279

1577

32

74

171

40

980

1329

1653

36

80

183

50

1016

1383

1733

38

84

196

63

1062

1449

1819

41

86

209

75

1167

1577

1897

54

101

221

90

1323

1750

2216

72

121

270

110

1423

1870

2344

84

134

289

125

1618

2085

2479

106

160

311

Tariff groups

Tariff group

Contracted power

b [m3/h]

the quantity of the used gas per 1 year

a [m3/y]

W-4

b = 10

a > 8000

W-5

10 < b = 65

-

W-6

65 < b = 600

-

W-7

b > 600

a = 5000*b

The Commune and Town Odolanów has provided details concerning the building possibilities of the gas pipeline on the investment sites. The planed capacity of the described pipeline is 400 m3/h The information including a connection cost and pipeline length are presented separately for every investment site :

  • Gli¶nica III - there is a building possibility for gas pipeline PE 180, length 500m, the connection cost - 30 000 PLN
  • Gli¶nica II - there is a building possibility for gas pipeline PE 180, length 450m,the connection cost - 30 000 PLN
  • Gli¶nica I - there is a building possibility for gas pipeline PE 90, length 1000m, the connection cost - 55 000 PLN